PT. SCHNEIDER ELECTRIC INDONESIA
1Goods & Services Procurement Work Recloser installation 20 KV, 630A, 12.5KA Complete controller RTU, PT 20KV/220V, 6BHLA, 21KVPT. Schneider Electric Indonesia
2 MV Scada Integration work PT. Schneider Electric Indonesia
4Procurement of support materials and accessories for recloser installationPT. Schneider Electric Indonesia
PT. BIO CYCLE INDO
1Procurement and installation of LVMDP panels Merk Schneider PT. BioCycle Indo
2Procurement and installation of 690 KVA power PLN connectionsPT. BioCycle Indo
3SDP Panel Procurement Work, Modification and Power InstallationPT. BioCycle Indo
4Cable Ladder Tray Installation Work and Instrument InstallationPT. BioCycle Indo
5Transformer Furification WorkPT. BioCycle Indo
FIRST RESOURCES
1Management of Certificate of Operational Properness (SLO) and Installation of a 555 KVA Electrical NetworkPT. Subur Arum Prosperous
2Management of New Connection Fees, Electrical Installation Guarantee (JIL) and Operational Worthiness Certificates (SLO) for 52 UnitsPT. True Palmax Plantation
3Management of New Connection Fees, Electrical Installation Guarantee (JIL) and Operational Worthiness Certificates (SLO) for 956 UnitsPT. Subur Arum Prosperous
4New Electrical Grid Connection Work, Management of Electricity Guarantee Costs (JIL) and Operational Worthiness Certificates (SLO) for 167 UnitsPT. Surya Intisari Raya
5New Electrical Grid Connection Work, Management of Electricity Guarantee Costs (JIL) and Operational Worthiness Certificates (SLO) for 689 UnitsPT. Mighty Ciliandra
PENGALAMAN PEKERJAAN UNIT TRANSMISI
Procurement of goods
1Procurement of UPT Pekanbaru Access PointsPT. PLN (Persero) UIP3BS UPT Pekanbaru
2Improvement of the Garuda Sakti GI EnvironmentPT. PLN (Persero) UIP3BS UPT Pekanbaru
3UPT Pekanbaru Router MaintenancePT. PLN (Persero) UIP3BS UPT Pekanbaru
4UPT Pekanbaru Switch MaintenancePT. PLN (Persero) UIP3BS UPT Pekanbaru
5Procurement of LA TR at ACDBPT. PLN (Persero) UIP3B Sumatra UPT Medan
6Procurement of Back Up Supply Construction of the Control Center BuildingPT PLN (Persero) APD Riau
7Procurement of New GI Minimum Facilities & PDKB BuildingPT. PLN (Persero) UIP3B Sumatra - UPT Pekanbaru
8Procurement of GI Monitoring Monitoring System at UPT PekanbaruPT. PLN (Persero) UIP3B Sumatra - UPT Pekanbaru
Gardu Induk
1Improvement of Operating Voltage Quality at GITET BetungPT PLN (Persero) UIP3BS
2Procurement and Installation of Relay Defense Scheme UP2B SBUPT PLN (Persero) UIP3B Sumatera
UP2B Sumbagut
Battery
1Procurement and installation of 48 VDC chargers and batteries for the UP2B system in North SumatraPT PLN (Persero) UP2B Sumbagut
PT WILMAR NABATI INDONESIA
1Disassembly and Installation of Recloser 20KV, 630A, 12,5A complete CT 20KV/220V, 5bh LA 21KV - 10KAPT. Dumai Industrial Area
2Installation of Street Lights P. SumatraPT. Dumai Industrial Area
3KID Pelintung Electrical Chimney plant 30 MW workPT. Dumai Industrial Area
4Painting Work on Electric Poles and Repair of Pole Covers in the Jl. P. SumatraPT. Dumai Industrial Area
5Cable Installation of Power Additional Cooling Pump Boiler CFBC in the 30 MW KID Pelintung Power Plant AreaPT. Dumai Industrial Area
6Electrical and Instrumentation Boiler Work 75 TPH PT. Pelintung KIDPT. Dumai Industrial Area
7Electrical Installation Work for the Addition of 30 MW KID Pelintung RO Power Plant Instrument CablesPT. Dumai Industrial Area
860 MVA Transformer MaintenancePT. Dumai Industrial Area
9Preventive Maintenace Cubicle & Dry Type TrafoPT. Dumai Industrial Area
10Electrical Installation Work for Heavy Equipment Jet Pump Machine PT. Pelintung KIDPT. Dumai Industrial Area
11Electrical Works Cooling Tower Project Of Water Treatment Plant System Mixed Bad Cap 2x100 TPH Power PlantPT. Dumai Industrial Area
12Painting of electric gutters and repair of pole hoods in the Jl. P. Sumatra'PT. Dumai Industrial Area
13Coal Boiler Conveyor Electrical Installation Upgrade Work 1.2.3PT. Dumai Industrial Area
14WINA CCTV Installation WorkPT. Dumai Industrial Area
15Repair of Electrical Installation in the LAM Building (Institution of Indigenous Peoples)PT. Dumai Industrial Area
16Electrical Installation Repair in Canteen (Partner & Employee Canteen)PT. Dumai Industrial Area
17Dismantle Panel Power Box for Turbin & RewirPT. Dumai Industrial Area
18Withdrawal of SUTR - LVTC PJU Jl. BatamPT. Dumai Industrial Area
19Installation of Colling Fan Chemical RoomPT. Dumai Industrial Area
20Removing and repairing 1 Unit of Street Light Pole and 12 Light PointsPT. Dumai Industrial Area
21WINA Substation MaintenancePT. Dumai Industrial Area
22Installation and repair of lighting in the Dry Coal Yard Power Plant 30 MW KID Pelintung areaPT. Dumai Industrial Area
23Repair of Mosque Installation in KID Pelintung Central Office AreaPT. Dumai Industrial Area
24Seroja 5 & 7 Electrical Installation Fireplace in the Pelintung Quary Mess AreaPT. Dumai Industrial Area
25Fabrication and installation of GH 2 & GH 3 area tray coversPT. Dumai Industrial Area
26Replacement of Lampposts Jl. P. RupatPT. Dumai Industrial Area
27 Compressor Air Flow Installation (Utility PIMS Integration) Area 200 TPH RO Plant KIDPT. Dumai Industrial Area
27Jointing Cable, Repair & Rewiring Panels in Boiler AreasPT. Dumai Industrial Area
29Installation of New PT.PAA Plot Area Illumination LightingPT. Dumai Industrial Area
30Fabrication and installation of GH 2 & GH 3 area tray coversPT. Dumai Industrial Area
31Lobby Installation Repair, Illies, PGA TCSDBS WINA NKBPT. Dumai Industrial Area
32Procurement of work for PAL PRM Tiga Putri Resident, PRM Villa Padma II, Stella Gracia school and PRM Pesona BerdikariPT. PLN (Persero) Pekanbaru Area
33Construction/Installation of JTM 20 KV SUTM 20 KV Double Circuit Wire 240 MM2Riau Electrical Construction Implementation Unit PT. PLN Wil. Riau and Riau Islands
34Procurement of Work for PAL PRM Tiga Putri Resident, PRM Villa Padma II, Stella Gracia School and PRM Pesona BerdikariPT. PLN (Persero) Pekanbaru Area
35Procurement of Development Services SUTM A3CS 3X240 mm2 and SKTM 3X240 mm2 for Bahkti Feeders, Cemara, Perawang and Folding Cloth PT. PLN (Persero) Pekanbaru AreaPT. PLN (Persero) WRKR Pekanbaru Area
36Installation of 1x50KVA Distribution Substation For LisdesPT. PLN (Persero) UIWRKR UPPK Riau
37Installation of JTM 20 KV AAAC - 150 MM2, 70 MM2 Along 125.05 Kms For LisdesPT. PLN (Persero) WRKR
38Ail Management Services (Customer Data Improvement Revass)PT. PLN (Persero) WRKR Area Rengat
39Installation of JTM 20 KV AAAC - 150 MM2, 70 MM2 Along 72.40 Kms For LisdesPT. PLN (Persero) WRKR
40JTR, SR and APP connection point replacement work with a detailed unit price patternPT. PLN (Persero) WRKR Dumai Area
41Improvements to the Phase III containment system 70 Tower segment Sri Bintan - Air RajaPT. PLN (Persero) WRKR Riau Islands Sector
42Procurement and Installation of Lightning Protection for 150 Kv Tower Conveyors Spread in Bintan Early Streamer MethodPT. PLN (Persero) WRKR Tanjung Pinang Area
43JTM Installation 20 KV AAACS 150mm2 21.80 KMS Length For LisdesPT. PLN (Persero) UIWRKR UPPK Riau
44Installation of a 6x100 KVA Distribution SubstationPT. PLN (Persero) UIWRKR UPPK Riau
45Installation of JTR LVTC 3x70mm + 1x50mm Long 17.9 KMS For LisdesPT. PLN (Persero) UIWRKR UPPK Riau
46Mounting JTR 3X70mm + 1x50mm Long 13965 KMS For LisdesPT. PLN (Persero) UIWRKR UPPK Riau
47Installation of JTM 20 KV AAAC 150mm2, 3.60 KMS Long for LisdesPT. PLN (Persero) UIWRKR UPPK Riau
48Installation of 2x50kva distribution substation for LisdesPT. PLN (Persero) UIWRKR UPPK Riau
49Installation of JTR LVTC 3X70mm+1x50mm, Along 12.10 KMSPT. PLN (Persero) UIWRKR UPPK Riau
50Installation of Distribution Substations 1x50KVA + 1X100 KVA For LisdesPT. PLN (Persero) UIWRKR UPPK Riau
51Installation of JTM AAAC 150mm2, along 4.55 KMS for lisdesPT. PLN (Persero) UIWRKR UPPK Riau
52Installation of JTR LVTC 3X70mm+1x50mm, 3.65KMS longPT. PLN (Persero) UIWRKR UPPK Riau
53Installation of 1x100KVA Distribution Substation For LisdesPT. PLN (Persero) UIWRKR UPPK Riau
54Installation of JTR LVTC 3X70mm+1x50mm, 17.9 Kms long for Lisdes Sungai Daun Village locationPT. PLN (Persero) UIWRKR UPPK Riau
55Installation of JTR LVTC 3X70mm2+1x50mm2, 4.94 Kms for LisdesPT. PLN (Persero) UIWRKR UPPK Riau
56Installation of 1x100Kva Distribution Substation For LisdesPT. PLN (Persero) UIWRKR UPPK Riau
57Installation of 1x50Kva+1x100Kva Distribution Substation for LisdesPT. PLN (Persero) UIWRKR UPPK Riau
58Installation of 1x50Kva Distribution Substation For LisdesPT. PLN (Persero) UIWRKR UPPK Riau
59Installation of SKTM 3 x 300mm 2, 1.01 KMS LONGPT. PLN (Persero) UP3 Pekanbaru
60INSTALLATION JTM 20KV AAACS 150MM2, 18.60 Kms LongPT. PLN (Persero) UP3 Pekanbaru
61JTm Installation 20KV AAACS 150mm2, 30.60 KMS LONGPT. PLN (Persero) UP3 Pekanbaru
62Installation of JTM 20KV AAACS 150mm2, 20.35 Kms LONGPT. PLN (Persero) UP3 Pekanbaru
63Installation of Special PilesPT. PLN (Persero) UP3 Pekanbaru
64Installation of Distribution Substations 3 x 50 KVA + 5 x 100 KVAPT. PLN (Persero) UP3 Pekanbaru
65Installation of JTR LVTC 3 x 70mm + 1 X 50mm, LONG 17.34 KmsPT. PLN (Persero) UP3 Pekanbaru
66Installation of 1 x 100KVA + 2 x 160KVA Distribution SubstationsPT. PLN (Persero) UP3 Pekanbaru
67Installation of JTR LVTC 3 x 70mm + 1 X 50mm, 9.30 Kms LONGPT. PLN (Persero) UP3 Pekanbaru
68Installation of Distribution Substations 1 x 50 KVA + 2 x 100 KVAPT. PLN (Persero) UP3 Pekanbaru
69JTM Installation 20KV AAAC 150mm2 Throughout 125.05-2017PT. PLN (Persero) UIWRKR UPPK Riau
70Installation of JTM 20kv AAAC 150 mm2,70 mm2 Along 72,40 KMSPT. PLN (Persero) UIWRKR UPPK Riau
71Installation of JTR LVTC 3 X 70mm + 1x50mm, SWLENGTH 9.30 KMS FOR VILLAGE ELECTRICITY LOCATION OF Ulak Patian VILLAGE AND Rantau Binung Sakit KAB. ROKAN HULU PT. PLN (Perso) UPP 3PT. PLN (Persero) UIWRKR UPPK Riau
72Installation of a 1x50 KVA distribution substation for village electricity in the locations of Ulak Patian and Rantau Binung Sakti villages, Rokan Hulu Regency PLN UP3 PEKANBARUPT. PLN (Persero) UIWRKR UPPK Riau
73Installation of JTM 20KV AAAC 150mm2, LONG 2.60 KMS for village electricity, shortcut village KAB. INDRAGIRI HILIR PT. PLN (Persero) UP3 RENGATPT. PLN (Persero) UIWRKR UPPK Riau
74Installation of JTR LVTC 3X70mm+2, 1.1 KMS longPT. PLN (Persero) UIWRKR UPPK Riau
75Planting of iron tings and installation of special mansedPT. PLN (Persero) UIWRKR UPPK Riau
76Installation of JTM 20KV AAAC 150mm2, 5.96 KMS long for electricity to local village villages Griya mukti jaya KAB. INDRAGIRI HILIR PT. PLN (Perso) UP3 RENGATPT. PLN (Persero) UIWRKR UPPK Riau
77Installation of JTR LVTC 3X70mm + 1x50mm, 2,047 KMS long for village electricity, Griya Mukti Jaya Village, KAB. INDRAGIRI HULU PLN UP3 RENGATPT. PLN (Persero) UIWRKR UPPK Riau
78Installation of a 1x100kVA distribution substation for village electricity village location village location griya mukti jaya KAB. INDRAGIRI HILIR PLN UP3 RENGATPT. PLN (Persero) UIWRKR UPPK Riau
79Installation of jtm 20KV AAAC 150mm2, 5.41 KMS long for village electricity, location of Banyan Mulya village, KAB. INDRAGIRI HLIR PT. PLN (Perso) UP3 RENGATPT. PLN (Persero) UIWRKR UPPK Riau
80Installation of JTR LVTC 3x70mm+1x50mm, 2,038 KMS long for village electricity, location of Banyan Mulya village KAB. INDRAGIRI HILIR PLN UP3 RENGATPT. PLN (Persero) UIWRKR UPPK Riau
81Installation of a 21x100k VA distribution substation for village electricity in the village of Beringin Mulya KAB. INDRAGIRI DOWNSTREAM PLN UP3 RENGATPT. PLN (Persero) UIWRKR UPPK Riau
82Installation of JTM 20KY AAAC 150mm2, 3.17 KMS long for village electricity, Bagan Jaya village location KAB. INDRAGIRI HILIR PT. PLN (PERSERO) UP3 RENGATPT. PLN (Persero) UIWRKR UPPK Riau
83Installation of JTR LVTC 3x70mm + 1x50mm, 1x50mm, 0.92 KMS long for village electricity, Bagan Jaya village location KAB. INDRAGIRI HILIR PLN UP3 RENGATPT. PLN (Persero) UIWRKR UPPK Riau
84Installation of a 1x50kVA distribution substation for village electricity in the location of Bagan Jaya Village KAB. INDRAGIRI HILIR PLN UP3 RENGATPT. PLN (Persero) UIWRKR UPPK Riau
85Installation of JTM 20KV A3C 150mm2, along 8.25 KMSPT. PLN (Persero) UIWRKR UPPK Riau
86Installation of JTM 20KV AAAC 150mm2, 34.41 KMS long for village electricity. Locations in villages are scattered KCE. Bird Islands PT. PLN (Persero) UP3 RENGATPT. PLN (Persero) UIWRKR UPPK Riau
87Installation of a 1x50 kVA distribution substation for village electricity in the location of the KAB shortcut village. INDRAGIRI HILIUR PT. PLN ( Perso) UP3 RENGATPT. PLN (Persero) UIWRKR UPPK Riau
88Manufacture of storage tanks and installation of fuel piping for PLTD locations (Tembilahan, Sei Guntung, Pulau Burung) PT. PLN (Persero) WRKR (Regatta Area)PT. PLN (Persero) WRKR
89Procurement & Installation of Storage Tanks for the construction of Sultan Taha Jambi Airport FacilitiesPT. Wijaya Karya (Persero) Tbk
90ULP Pasir Pangaraian building improvementPT. PLN (Persero) WRKR UP3 Pekanbaru
91Building and Facilities Repair of Teluk Lembu SubstationPT. PLN (Persero) UIP3BS UPT Pekanbaru
92Procurement of ULP Pasir Pangaraian Maintenance OfficePT PLN (Persero) UP3 Pekanbaru
93Procurement of Ail Revass Management Services, Improvement of Customer Data at Unit PricesPT. PLN (Persero) Area Pekanbaru
94Procurement of Cors Arm UNP 100X50X6X2000 mm2PT. PLN (Persero) Area Pekanbaru
95Procurement of Ail Revass Management Services, Improvement of Customer Data at Unit PricesPT. PLN (Persero) Area Pekanbaru
96Radio Communication Tower Grounding System Repair - Grounding Repair/ReplacementPT PLN (Persero) UP2D Riau
97Procurement of Radio Gateway, RCU Voltage Relay and Surge Arrester Repeater Radkom - Command CenterPT PLN (Persero) UP2D Riau
98Development of Mainland Riau Communication Radio - Procurement of communication radios to reduce interruption durationPT PLN (Persero) UP2D Riau
99Procurement of HT Radio Communications - Procurement of Communication Radios to Reduce Interference DurationPT PLN (Persero) UP2D Riau
100Construction of Rupat Island Radio Communication Repeater - Procurement of Communication Radio to Reduce Interference DurationPT PLN (Persero) UP2D Riau
101Substation of Kerinci GI Repeater Antenna Replacement WorkPT PLN (Persero) UP2D Riau
102Construction of Radio Communications for Riau and Riau Islands - Tri Angle TowerPT PLN (Persero) UP2D Riau
103The demolition of the Peranap TowerPT PLN (Persero) UP2D Riau
104Procurement and installation of rectifiers at PT. PLN (Persero) UP2D North SumatraPT PLN (Persero) UP2D North Sumatra
Battery Charger
1Procurement of battery chargersPT PLN (Persero) UP3 Pekanbaru
2Keypoint Power Supply Backup Maintenance ProcurementPT PLN (Persero) UP2D Riau
3Keypoint Battery ProcurementPT PLN (Persero) UP2D Riau
4Procurement of 110 VDC Backup Supply Systems for Switching SubstationsPT PLN (Persero) UP2D Riau
Pengadaan Barang
1Procurement and installation of TM 20 KV cubiclesRiau Electrical Construction Implementation Unit PT. PLN Wil. Riau and Riau Islands
2Procurement of 20 KV Cubicles Complete Automatic Transfer Switch (ATS)PT. PLN (Persero) WRKR
32020 Switching Equipment Maintenance ProcurementPT PLN (Persero) UP2D Riau
4Procurement of Thermal DronesPT PLN (Persero) UP2D Riau
5Procurement of Equipment for Warehouse Arrangement According to SMLPT PLN (Persero) UP2D Riau
6Procurement of Radio Voice MaterialsPT PLN (Persero) UP2D Riau
7Procurement of Equipment for Simulation of Riot and Bomb TerrorPT PLN (Persero) UP2D Riau
8Procurement of Tap ConnectorsPT PLN (Persero) UP3 PKU
9Procurement of Phase II Connector Tap MaterialsPT PLN (Persero) UP3 PKU
10Material Procurement of Tap Connector Stage IIIPT PLN (Persero) UP3 PKU
11Procurement of Phase IV Connector Tap MaterialsPT PLN (Persero) UP3 PKU
PT HALEYORA POWER REGION VI
1Load Balancing and Installation of the Pekanbaru Ground Road Area in 2021PT. Haleyora Power Region VI
2Iconnet Service Marketing Through Marketing Partners in the Central Sumatra Regional Business Unit StrategyPT. Indonesia Comnets Plus
3Implementation of Procurement of Partners for Central Sumatra Stroomnet Work 4PT. Haleyora Power Region VI
4Implementation of Procurement of Work Partners for the Central Sumatra Iconnet 4 Phase 2 WorkPT. Haleyora Power Region VI
5Implementation of the Procurement of Needs for Collaboration Partners for the Stroomnet Project for the Central Sumatra Region 4 Phase 3PT. Haleyora Power Region VI
6Implementation of Procurement of Central Sumatra Iconnet Work Partners 2PT. Haleyora Power Region VI
7Implementation of Procurement of Central Sumatra Iconnet Work Partners 3PT. Haleyora Power Region VI
8Implementation of Procurement of Work Partners for the Central Sumatra Iconnet 2 Phase 2 Work
PT. Haleyora Power Region VI
9Implementation of Procurement of Work Partners for the Central Sumatra Iconnet 3 Phase 2 WorkPT. Haleyora Power Region VI
10Implementation of Procurement of Work Partners for the Iconnet Work for the Sumbagteng Region 2 Phase 3PT. Haleyora Power Region VI
11Implementation of Procurement of Work Partners for the Iconnet Work for the Sumbagteng Region 2 Phase 4
PT. Haleyora Power Region VI
12Implementation of the Procurement of Work Partners for the Iconnet Work for the Sumbagteng Region 2 Phase 5PT. Haleyora Power Region VI
13Implementation of Procurement of Work Partners for the Iconnet Work for the Central Sumatra Region 3 Phase 3PT. Haleyora Power Region VI
14Implementation of Procurement of Work Partners for the Iconnet Work for the Sumbagteng Region 3 Phase 4PT. Haleyora Power Region VI
15Implementation of the Procurement of Work Partners for the Iconnet Work for the Sumbagteng Region 3 Phase 5PT. Haleyora Power Region VI
PT INDONESIA COMNETS PLUS (ICON+)
1Iconnet Service Marketing Through Marketing Partners in the Central Sumatra Regional Business Unit StrategyPT. Indonesia Comnets Plus
2Procurement of Activation Installation Services for 2022 SBU RSBTPT. Indonesia Comnets Plus